- Engineer / Naval Architect
-
Curriculum Vitae
SENIOR SURVEY ENGINEER
PERSONAL INFORMATION: Date of Birth : 02 Oct 1965
Nationality : Indian
Passport No : Z1728285 and valid upto 26 Jun 2018
CDC No : MUM 101655 and valid upto 19 Aug 2022
SAFETY CERTIFICATES:
- OPITO approved BOSIET valid till : - 22 Sep 2021
- Norwegian Medical valid till : - 24 Sep 2019
- UKOO Medical valid till : - 24 Sep 2019
ACADEMIC & PROFESSIONAL QUALIFICATIONS
- Diploma in Electronic Engineering from Indian Naval Electrical Engineering Institute INS Valsura,
- 6 month Diploma in Computer Hardware from Institute of management and Engineering Technology,
- Personnel Management & Industrial relations from Institute of Management & Engineering Technology.
- 6 months Diploma in computer science from Indo-German
TRAINING
COURSES
Behavioural Training 1 Personnel Effectiveness 18 Jul 03 2 Project Managers Overview - Logistic Support 29 Jul 03 HSE Training 1 Basic offshore safety induction & emergency Training
(Inluding HUET & EBS) - OPITO Approved26-28 Nov 07 2 HSE Management System 05-07 Jun 06 3 Internal Auditors Training for Occupational Health and Safety Management System (OHSAS 18001 : 1999) 27 Jun 06 Occupational Training 1 Fundamentals And Advance Techniques Of Gps
Positioning7 Jul 03 2 Hardware And Instalation Of New Software 8 Jul 03 3 Tides And Its Importance On Bathymetry And Operation Of Starfix Mss 9 Jul 03 4 Installation And Operation Of Gps, Dgps Equipments (Starfix Plus, Hp) 10 Jul 03 5 Interfacing & Operation Of Starfix Seis, Pc Tug 11 Jul 03 6 Fundamentals, Planning & Execution Of Survey 14 Jul 03 7 Operation Of Echo Sounder & Heave Compensator 17 Jul 03 8 Operation & Deployment Of Sector Scan & Usbl 24 Jul 03 9 Deployment Of Current Meter 7 Aug 03 10 Installation And Configuration Of Starfix Nav And
Drone20-21 Aug 03 11 Operation And Navigation On Pipelay Barge 30 Jul 04 12 Coda Re200 Data Processing 05-06 Jul 04 13 Starfix Seis And Wombat 05-06 Aug 04 14 Glog, Gplot, Mosaic & Interp 08-16 Mar 05 15 Basic Starfix Geophysical Sutie 25 Sep 03 Oct 06 EMPLOYMENT HISTORY:
WORKING AS FREELANCE SENIOR SURVEY ENGINEER
06 May – 01 July 2015 Carried out Sea Bed Survey at offshore of Saudi Arabia in Red Sea for Saudi Aramco. FSME Project No. SAH-11 / MS29
MV AL Nehem
FSME Equipment : Star Pack, Applanix POSMV, TSS Meridian Gyro, SBES ODOM Echotrac MK 3, MBES KongsBurg EM 2040/2040C, Motion Sensor- (TSS MRU, Seatex MRU5), SV profiler- (Valeport Mini-SVP & AML MINOSX) SSS (Edgtech Tow fish 4200-FS, SCU 701DL), Sonardyne USBL (NCU, Tx/Rx-8068, Beacon- WSM) Magnetometer- Geometrics G881, SBP EdgeTech X-Star, Applied acoustic CSP 300, Boomer, Geopulse Rx-5210A, Mini Hydrophone, Glog IV
Softwere:- Starfix Suit 10.1, Qinsy 8.10, SIS 4.1.5,(Multibeam Data Aquisition) EdgeTech Discover, Glog/gplot, Data Log Express, Sea Cast,
Sonardyne Fusion, MS office,
Responsible For: Maintainance of Survey equipment and Leading/Online Sr.Engineer
07 Sep – 14 Dec 2014 Carried out Sea Bed Survey at offshore of Saudi Arabia in Red Sea for Saudi Aramco. FSME Project No. SAH-11 / MS29
MV AL Nehem
FSME Equipment : Star Pack, Applanix POSMV, TSS Meridian Gyro, SBES ODOM Echotrac MK 3, MBES KongsBurg EM 2040/2040C, Motion Sensor- (TSS MRU, Seatex MRU5), SV profiler- (Valeport Mini-SVP & AML MINOSX) SSS (Edgtech Tow fish 4200-FS, SCU 701DL), Sonardyne USBL (NCU, Tx/Rx-8068, Beacon- WSM) Magnetometer- Geometrics G881, SBP EdgeTech X-Star, Applied acoustic CSP 300, Boomer, Geopulse Rx-5210A, Mini Hydrophone, Glog IV
Softwere:- Starfix Suit 10.1, Qinsy 8.10, SIS 4.1.5,(Multibeam Data Aquisition) EdgeTech Discover, Glog/gplot, Data Log Express, Sea Cast,
Sonardyne Fusion, MS office,
Responsible For: Maintainance of Survey equipment and Leading/Online Sr.Engineer
25 Nov – 30 Dec 2013 Carried out Site/ Seabed Survey at Block Wall & Sparrowhawk UKCS for Nexen Petrolium UK Ltd. FSL Project No. 131228-22
Fugro Discovery
Fugro Survey Ltd Equipment / Software Used: Star Pack, SSS (Edgtech Tow fish 4200-FS, SCU 701DL), Magnetometer- Geomatrics G881, SBP GeoAcoustic 5410A, Heave compensator TSS320, Mini Air Gun, SVP Valepot MIDAS SVX2,
Softwere:- Starfix Suit 9.1, EdgeTech Discover 4200 FS, Glog/Gplot, Data Log Express, MS office
Responsible For: Maintainance of Survey equipment and 12 hrs online Shift
11 Nov – 24 Nov 2013 Carried out Site Survey at Block Mallard UKCS for Centrica, FSL Project No. 131183-22
Fugro Discovery
Fugro Survey Ltd Equipment / Software Used: Star Pack, SSS (Edgtech Tow fish 4200-FS, SCU 701DL), Magnetometer- Geomatrics G881, SBP GeoAcoustic 5410A, Heave compensator TSS320, SVP Valepot MIDAS SVX2,
Software:- Starfix Suit 9.1, EdgeTech Discover 4200 FS, Glog/Gplot, Data Log Express, MS office
Responsible For: Maintainance of Survey equipment and 12 hrs online Shift
05 Nov – 10 Nov 2013 Carried out Site Survey at Block Elgin UKCS for Total E&P Ltd. FSL Project No. 131015-22
Fugro Discovery
Fugro Survey Ltd Equipment / Software Used: Star Pack, SSS (Edgtech Tow fish 4200-FS, SCU 701DL), Magnetometer- Geomatrics G881, SBP GeoAcoustic 5410A, Heave compensator TSS320,SVP Valepot MIDAS SVX2, Software:- Starfix Suit 9.1, EdgeTech Discover 4200 FS, Glog/Gplot, Data Log Express, MS office
Responsible For: Maintainance of Survey equipment and 12 hrs online Shift
29 Aug – 16 Sep 2013 Carried out Geohazard Survey at Block 15/29a UKCS for Chevron North Sea Ltd. FSL Project No. 130715-24
Fugro Searcher
Fugro Survey Ltd Equipment / Software Used: Star Pack, SSS (Edgtech Tow fish 4200-FS, SCU 701DL), SBP 300 (KongsBerg ), 6 Gun Array, 96 Channel 600m Streamer, SVP Valepot MIDAS SVX2, Dual Van Veen Grab, Hamon Grab, Softwere:- Starfix Suit 9.1, EdgeTech Discover 4200 FS, Glog/Gplot, Long Shot(V8.13)for Gun Control, NTRS2, Seisnet, Data Log Express, MS office
Responsible For: Maintainance of Survey equipment and 12 hrs online Shift
24July – 28 Aug 2013 Carried out Environmental / Site Survey at Central North Sea for Shell
Ltd. FSL Project No. 130927-24
Fugro Searcher
Fugro Survey Ltd Equipment / Software Used: Star Pack, SSS (Edgtech Tow fish 4200-FS, SCU 701DL), SBP 300 (KongsBerg ), Magnetometer Geomatrics G881, 6 Gun Array, 48 Channel 600m Streamer, SVP Valepot MIDAS SVX2, Dual Van Veen Grab, Hamon Grab,
Softwre:- Starfix Suit 9.1, EdgeTech Discover 4200 FS, Glog/Gplot, Long Shot(V8.13)for Gun Control, NTRS2, Seisnet, Data Log Express, MS office
Responsible For: Maintainance of Survey equipment and 12 hrs online Shift
09 Jun – 15 Jun 2013 Carried out Debris / Site Survey at for Maersk Oil Nort Sea Ltd. FSL Project No. 130715-24
Fugro Searcher
Fugro Survey Ltd Equipment / Software Used: Star Pack, SSS (EdgeTech Tow fish 4200-FS, SCU 7010DL), SVP Valepot MIDAS SVX2, Starfix Suit 9.1, Discover 4200 FS, Glog/Gplot, Data Log Express, MS office
Responsible For: Maintainance of Survey equipment and 12 hrs online Shift
12 May – 8 Jun 2013 Carried out SNS decommissioning / Environmental / Site Survey at Southern North Nea (Block 48/49 UKCS) for ConocoPhilips UK Ltd.
Fugro Searcher
Fugro Survey Ltd Equipment / Software Used: Star Pack, SSS (EdgeTech Tow fish 4200-FS, SCU 7010DL), SVP Valepot MIDAS SVX2, Dual Van Veen Grab, Hamon Grab, Starfix Suit 9.1, EdgeTech Discover 4200 FS, Glog/Gplot, Data Log Express, MS office
Responsible For: Maintainance of Survey equipment and 12 hrs online Shift
30 March – 16 April 2013 Carried out Vessel Positioning of KL saltfjord at Jasmine/Judy field in UKCS for ConocoPhilips UK Ltd.
KL Saltfjord
Fugro Survey Ltd Equipment Used: Star Pack, 4100LRS, Hemisphere, Meridian Gyro, HPR USBL system, Starfix suit 9.1 for Online Navigation MS Office
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
29 Aug – 27 Sep 2012 Carried out Vessel Positioning of DSV Seawell at GGA field in UKCS for Well Ops UK Ltd.
DSV SEAWELL
Fugro Survey Ltd Equipment Used: Vessel Positioning System (GPS with Fugro Starfix Demodulator 3500LR), HPR USBL system, Starfix suit 9.1 for Online Navigation
Responsible For: Maintaining 12 hrs online Shift as Second Surveyor
EXPERIENCE:
Dec 2007 – Till 21 Oct 2011 Worked as Sr. Survey Engineer and online Second Surveyor on 2 months on one month off rotation with Fugro Survey (Aberdeen) Ltd and executed the following jobs:
In between the offshore worked in workshop on various survey equipment Specialy on LBL system
10 Oct 11 – 21 Oct 11 Carried out Rig Move support of Wilhunter from Kraken to Orlendo in UKCS for SPD UK Ltd. Job No. 31_00697 (PM – C. Moris)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
14 Sep 11 – 03 Oct 11 Carried out Rig Move support of Rowan Gorila5 from Dundee Ship yard to Franklin in UKCS for Total E & P UK Ltd. Job No. 31_00698 (PM – C. Moris)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
26 Aug 11 – 9 Sep 11 Carried out Rig Move support of Sedco714 from Dradour (west of Sethland) to Ardbeg (East of Sethland) in UKCS for Total E & P UK Ltd. Job No. 31_00694 (PM – F )
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
17 Aug 11 – 22 Aug 11 Carried out Rig Move support of Swift10 from Block L13 to K08 in Dutch Water for Shell Netherland. Job No. 32_00665 (PM – Dave Parson)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
22 July 11 – 29 July 11 Carried out Rig Move support of Galaxy2 from Invergordon Ship yard to Faraday UKCS for GL Noble Denton. Job No. 31_00465 (PM – C. Moris)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
09 July 11 – 18 July 11 Carried out Rig Move support of Sedco 714 from Oban to Edradour for Total E & P UK Ltd. Job No. 31_00558 (PM – C. Moris)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
02 May 11 – 06 May 11 Carried out Rig Move support of NTVL from Tullich to Courageous for Maersk Oil UK Ltd. Job No. 31_00061 (PM – C. Moris)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
19 Apr 11 – 24 April 11 Carried out Rig Move support of NTVL from Goosander to Tullich UKCS for Maersk Oil . Job No. 31_00299 (PM – D Allen)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
22 Dec10 – 10 Jan11 Carried out Rig Move support of Ensco102 from Judy to Jade for ConocoPhilips UK Ltd. Job No. 31_00332 (PM – C. Moris)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
02 Oct 10 – 13 Oct 10 Carried out Rig Move support of PBLJ from Monan UKCS to (Holand) Ship yard for BP UK Ltd. Job No. 31_00295 (PM – G Fuller)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
19 July 10 – 26 July 10 Carried out Rig Move support of NTVL from Dunglass to Dunbarton UKCS for Maersk oil UK Job No. 31_00317 (PM – C.Moris)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
15 June 10 – 30 June 10 Carried out Rig Move support of Safe Caledonia from Dunbar to to for Total E & P UK Ltd. Job No. 31_00260 (PM – G Fuller)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
16 Apr 10 – 24 April 10 Carried out Rig Move support of Rowan Gorilla 5 from Elgin UKCS to Dundee Prince dock for Total E & P UK Ltd. Job No. 31_00087 (PM – G Fuller)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
26 Mar 10 – 12 Apr 10 Carried out Rig Move support of NTVL from D11 Dumbarton to G30 Gryphon UKCS field – for Maersk oil UK Job No. 31_00093 (PM – G Fuller)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
24 Dec 09 – 10 Jan 10 Carried out Rig Move support of Ensco102 from M9 Joanne to M3 Joanne UKCS field – for ConocoPhilips Job No. 31_00014 (PM – C.moris)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
24 Oct 09 – 28 Oct 09 Carried out site Survey on board Geo Prospector of Bugle 15/23 UKCS for Nexen Petrolium. Job No. 2800071/2
Responsible For: Senior Survey engineer
16 Oct 09 – 23 Oct 09 Carried out site Survey on board Geo Prospector of Brand 35/8 & 9 at Norwagian continental service for Nexen Petrolium. Job No. 2800071/3
Responsible For: Senior Survey engineer
26 Sep 09 – 09 Oct 09 Carried out Rig Move support of PBLJ from D8 Magnus to WI/25 Machar UKCS field – north sea for BP Marine Job No. 31_00035 (PM – G Fuller)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
29 Aug 09 – 07 Sep 09 Carried out Rig Move support of NTVL in North sea for Maersk/ Venture Job No. 31_0033/34 (PM – Georgina Fuller)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
15 Aug 09 – 19 Aug 09 Carried out Rig Move support of JW Mclean in North Sea for Petro . Job No. 31_0007 (PM – Criss moris)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
4 Jan 09 – 04 Feb 09 Carried out Rig Move support of Borgsten Dolphin in- for Maersk. Job No. 31_9698 (PM – Criss moris)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
24 Nov 08 – 01 Dec 08 Carried out Rig Move support of Noble Lynda Bossler at Dutch field – North Sea for Offshore marine conrator. Job No. 32_9799 (PM – Dave Pasons)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
19 Sep 08 – 24 Oct 08 Carried out positioning support of Skandi carla during construction support at KG/D6 field – Way of bangal, for Allseas. Job No. 34 - Dhirubhai
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
07 Aug 08 – 15 Aug 08 Carried out Rig Move support of Rowan Gorila 5 at Franklin UKCS field – for Total E & P Ltd. Job No. 31_9689 (PM - Cris moris
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
15 May 08 – 22 May 08 Carried out Rig Move support of PBLJ at Rinnes UKCS field – for BP Marine. Job No. 31_9507 (PM - Criss moris)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
28 Apr 08 – 05 May 08 Carried out Rig Move support of Ensco101 at for Transocan
(PM - Cris moris)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
30 Jan 08 – 15 Feb 08 Carried out Rig Move support of LEIV Erickson at south UIST field – for Transocean. (PM - Cris moris)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
17 Jan 08 – 28 Jan 08 Carried out Rig Move support of GSF Arctic iii for Petro . Job No. 31_9512 (PM - Cris moris)
Responsible For: Senior Survey engineer and Maintaining 12 hrs online Shift as Second Surveyor
07 Dec 07 – 12 Jan 08 Carried out positioning support of Barge Excalibour During Geotechnical investigation for array Ltd. Job No. 39_9413 (PM – Dave Parsons)
Responsible For: Senior Survey engineer and online Surveyor
01 Dec 07 – 05 Dec 07 Carried out Positioning support of NLV Pharos during Well head marker buoy relocation at Islay UKCS field for Tatal E & P Ltd Job No. 31_9399
Responsible For: Senior Survey engineer and online Surveyor
January 2006 – Nov 2007 Worked with Fugro Survey () Pvt. Ltd as Party Chief / Sr. Electronic Engineer.
01 Oct 07 – 04 Oct 07 Carried out Pre Engineering survey at Gangavaram port Vishakhapatnam east cost of India for Gangavaram port Ltd. (PM – Sudip Roy)
30 July 07 – 27 Aug 07 Carried out Geotechnical investigation support of SVR Bavenit at KG-D6 field east cost of for Fugro Holand. (Akar offshore Industries Ltd)
26 Feb 07 – 31 Mar 07 Carried out Pre-Engineering Survey on board M.V. Flamboyan at Mumbai High, Neelam and Heera filed for L&T. Job No. J_MAR_07-01 (PM – V.D. Khanduri)
06 Dec 06 – 10 Feb 06 Carried out Pipelay Support on board DLB 332 at Mumbai High for Global Offshore. Job No. J_CON_06_06 (PM – Bibhu Nayak)
09 Jul 06 – 29 Aug 06 Carried out Pipelay Support on board SSLB Semac 1 at Piltun Filed – for Fugro OPCO –
25 Apr 06 – 02 May 06 Carried out Pre Rig Move Stie Survey for BG Exploration and Production India Pvt. Ltd. Job No. J_2003_77 (PM – Bibhu Nayak)
06 Feb 06 – 31 Mar 06 Carried out Pipelay Support onboard DLB 264 for Global Industries Offshore.
Job No. J_2005_51 (PM – Bibhu Nayak)
April 2000 – Dec 2005 Worked with Fugro Geonics Pvt. Ltd as Sr. Electronic Engineer.
23 Nov 05 – 14 Dec 05 Carried out CP Survey of MUT T/Lines in Mumbai high for Hyundai Heavy Industries Ltd.
25 Sept 05 – 26 Oct 05 Carried out site survey of harbour for RPTL.
05Sep 05 to 13 Sep 05 Carried out Pre Rig move site Survey for BG Exploration and Production India Pvt. Ltd
16 May 05 to 22 May 05 Carried out Post Trench Survey of New Laid 28” & 30” pipe in Mumbai High for Hyundai Heavy Industries using
18 Mar 05 to 23 Apr 05 Carried out postioning of Pipelay Barge HD-60 and Anchor Handling during Pipelay for Hyundai Heavy Industries Ltd at Mumbai High
24 Feb 05 to 09 May 05 Carried out as laid Survey of 28” & 30” newly laid pipeline from MNW to Uran for Hyundai Heavy Industries
09 Jan 05 to 17 Jan 05 Carried out Rig Move of Discoverer 534 for RIL in K-G block/Kakinada
01 Jan 05 to 08 Jan 05 Carried out Rig Move of Trident – 6 at for Reliance Industries Ltd.
Installation of automatic tide guage on PQ Platform for BG Exploration and Production India Ltd at panna field
Carried out site survey at proposed Rig Location in KG Block for GSPCL
Carried out Rig Move of Perro Negro-3 at KG Block off for GSPCL
Carried out Rig Move of D-534 at D6 Block, off for RIL
Pre-Construction Survey for New MUT Pipeline prorject in mumbai high for Oil and Natural Gas Corporation Ltd
Pipeline Survey at Hazira West coast of for Clough Offshore
Pre Engineering Survey for proposed SPM and in west coast of for Kochi Refineries Ltd., .
Pre-engineering Surveys of N-9 Well Platform Project in High for Larsen & Toubro Ltd.
Carried out pre-engineering Survey for New MUT Pipeline Project in Mumbai high for Oil and Natural Gas Corporation Ltd.
As-laid Survey for Newly Laid Pipelines in Mumbai High & Bassein Field for Hyundai Heavy Industries Co. Ltd.
Side Scan Sonar Survey, Off Tuticorin, Of for OTEC Project, NIOT, Chennai
Site Survey of Proposed Pd-3s Well Location in Py-3 Field, Off Pandicherry, East Coast Of for Hardy Exploration and Production () Ltd.
Carried out Current Observations in for 36” Pipeline Crossing (SBHT) off , West Coast of India for Adsun Offshore Diving Contractors Pvt. Ltd.
Carried out Sector Scan Sonar for proposed and Platform at Bombay High for Hyundai Heavy Industries Co. Ltd.
Carried out Currentmeter Observations at CM2 and CM3 Locations for Cairn Energy India Pty Ltd., CB-OS/2 Block Development Project, Off Hazira
Carried out Currentmeter Observation at Hazira Platform Location to LBDP at Hazira, West Coast Of India for Niko Resources Limited, Hazira Offshore Development Project
Carried out Hazard Clearance Survey in 3D Seismic Survey Area, C‑23 and North Tapti Block, , West Coast of India for Laboratory of Regional Geodynamics (Large)
Carried out Soil sampling along proposed pipeline routes at Lakshmi field under CB-OS/2 Development Project off Hazira West coast of for Niko Resources Ltd.
Carried out Soil sampling along proposed pipeline routes at Lakshmi field under CB-OS/2 Development Project off Hazira West coast of for Cairn Energy India Pty Ltd.
Pipeline inspection Survey for IPCL in Ulwa Channel in/Panvel Creek for Gujarat Ambuja Cement Ltd.
Carried out Back-fill survey at Lakshmi Field for Hyundai Heavy Industries Co. Ltd.
Carried out Dredger Positioning (Ave Caesar) at Lakshmi Field for Hyundai Heavy Industries Co. Ltd.
Carried out Post-trench survey in Lakshmi Field for HHI Ltd.
Carried out Geophysical Survey at Machhlipatnam, Vizag for RIL
Carried out Seabed hazard / Anchor Clearance survey at PY3 Field for Hardy Exploration & Production () Inc.
Carried out Pre-engineering Survey for Shell India at Hazira/India
Carry out pre-construction survey for Cairn Energy at Surat/India
From February 1984 to February 1999:- Employed in Indian Navy as Electronic Engineer and work on different capacity
Equipment used :
Echosounder: Raytheon 719C/D, Hydrotrac, Deso 20, Deso 15, Echotrack DF 3200, Simrad EM 3002 Multi Beam Echosounder
Heave Compensators: TSS 320B, HS 50, MRU 4/H, DMS 2.
Sub Bottom Profilers: EG&G Uniboom/Catamaran/230 Plate/231 Capacitor Bank 232A Power supply. Geo Pulse: Catamaran/5813B Plate/5210A Receiver/5420A Power Supply, Apllied Acoustic CSP 1000 /1500 Power Supply, Sparker Comb. 1000j, 8 elements Hydrophone, : 310, Seabed 3010, Transreceiver/2x2 Transducer Array
HUNTEC : Huntec 70-Deep Tow Boomer
Recorders: EPC 3200, 1600, Ultra 3710, 200-135
Digital Recorder: CODA- DA200, GLog, GPlot, Ultra 120, EPC 1086 MP, Geo pinter 975.
Side Scan Sonar: EG&G 260TH Recorder/272TD Towfish, Geo Acoustic Transceiver / Tow fish, Klein 3000.
Positioning Systems: TRIMBLE: 4000RL/DL/SST/RS/Navtrack/NT200, DSM12/DSM132/ms750
STARFIX: VBS/MRDGPS/RTCM Convertor Box, 3500LR, 3100LR, 3000LR Receiver, LICA 400, Starfix HP, Star Pack, Multi fix 5, Delta fix Rx, Euro Drone, OMINISTAR / Microdome / Mdome / Flat Plate, Patch Antenna, MICRO FIX, Beacons
CTDS System: Valeport 200M, SVP, Valeport 600 & 602
Currentmeters: Valeport: BFM 008, 108 MkIII. Anderra RCM-9
Tide Gauges: Valeport: 700/710/ATG740.
Gyro: KVH Fluxgate Compass, S G Brown (Meridian ), Sperry SR 220 Gyro, Lehnkhul Repeater
Radio Commn: UHF Reference Station Setup, Teledesign TSI 9600, UHF Amplifier, VHF Teledesign, Satel,
Sector Scan Sonar: MS 1000, Tritech Seaking, Simrad Mesotech 940.
Magnetometer: Geometric 810, Elsec Model 7706 Recorder, Seaspy
USBL: Track Link, Sonardyne 8080
LBL: Mk4/MK5 EHF/MF Compatt, ROV Nav 4/5
Software: Starfix.Nav, Starfix.Sies 9.1, EIVA, Qinsy, Multifix5, Windos 2000/XP/Vista/Window7, MS Office, Glog / Gplot, Coda, Fusion/Starfix Acoustic.