Qualified Electronics Engineer with ,About 9 -years of experience in the maintenance of Offshore Platform’s, FPSO in the field of Instrumentation and Electrical Systems primarily Instrument and Control system which including DCS, PLC's, , Pneumatic , Electric & hydraulic valves, F&G and ESD Systems .
- 5 years of Experience as a Lead Instrument Engineer in FPSO /Platform's - Operation & Maintenance -
- About 4 years of Experience as an Instrument&Control Commissioning Engineer in FPSO conversion Project
- Experienced in FPSO Process system & Turret Equipment's Hook Up & Commissioning and Operation& Maintenance.
- Experience in FPSO and Platforms Annual shut-down maintenance
- Experience with DCS Control system installation and Operation & Maintenance.
- performed tasks in troubleshooting and logic modification of Programmable Logic Controller ,DCS --Allen Bradley ,Emerson Delta V,
- Understanding cause and effect diagram , ESD,PSD and Unit shut down concept.
- Good understanding in electrical drawing and instrumentation P&ID.
- Understanding of Functional Philosophy of Electrical & Instrumentation system.
- Experience Factory acceptance test and Site acceptance test
- Skills
-
- Maintenance 5 years by 2014
- FPSO Operation & maintenance 5 years by 2014
- FPSO Commissioning 4 years by 2016
- Employers
-
-
Senior Instrument & Control Technician at Gujrat State Petroleum Corporation
Mar 2015 - May 2015• Ensure that the permit to work system is in place and followed with supervisor and other department heads. • Carried out Corrective maintenance of Instruments, according to the work plan and coordinate same with supervisor and other departments. • Calibration & Function test of hydraulic valves, pneumatic valves (control & Shutdown valves) • Simulation & Function test of fire & gas system, Fire Fighting system, and General alarm system. • Preparation of Maintenance report and Breakdown reports. -
Lead Instrument & Control Technician at Petrovietnam Technical Servcies Corporation
Feb 2010 - Sep 2014Daily routine maintenance of Process & marine side Instrumentation equipmets . carried out effective trouble shooting in instrumentation field equipments and DCS system to minimize the production loss and carried out function test & Calibration during process on line with out Shutdown. Production: 3 stage Seperation with Gaslift Boilers MHI - 2 x 100T / hr , dual fired ( fuel gas/ MDO ) work pressure 16.0 bar Steam Turbine Generators - Dresser Rand 2 x 5 MW 6.6KVA Gas lift Compressor – Dresser Rand -- 1.8MW, 6.6KVA. , 2 stage reciprocating , capacity – 12 mmscfd Glycol Gehydration Package, Dewpoint Compressors Fiscal Metering, Cargo oil pump- 3Nos 440V/1.8MW Emergency Diesel Generator • Responsible/Lead the Instrumentation Maintenance team and directly reported to maintenance Supervisor. • Well conversant with AMOS system of PMS. Through AMOS creating of Preventive /Corrective Maintenance schedule of Instrumentation system, Prepration of Calibration & Function test Procedure, Preparation of Material & raising Purchase request, Break down reports. • Perform effective online troubleshooting of Process Instrument equipments with minimizing downtime and production losses in mind for FPSO critical equipments • Ensured that integrity of DCS the whole process area is not compromised whenever there are critical tasks to be accomplished. • Experienced and performed operation of Mitsubishi Marine boiler. • Ensure software licenses are current and ascertain that back-up/ system recovery tools are available where required. • Ensure that the permit to work system is in place and followed with supervisor and other department heads. • Implement the outstanding recommendations from audit issued by Clients • Compile and review of E&I SOP, Engineering Change request (ECR), Management of Change (MOC), Temporary Work Instruction (TWI), Shutdown/Breakdown report. -
Senior Instrument & Control Technician at MALAYSIA MARINE AND HEAVY ENGINEERING
Apr 2008 - Dec 2009• Ensure that all activities related to Instruments discipline commissioning are defined correctly. • Review the Contractors testing and commissioning procedures, schedule, and execution plans. • Identify and address all interface issues with other Project packages with respect to the instrumentation commissioning activities. • Definition of instrument pre-commissioning and commissioning scope within the sub-systems. • Follow up and review intervention in contractor’s preparation for pre-commissioning and commissioning scope for both onshore and offshore related to all instrument and control equipment. • Ensure contractors PTW and instrument isolation procedures and practices are in line with Company expectations. • Development of methods and strategies for commissioning. Approval of contractors system commissioning procedures and Operational Test Procedures. • Witness the contractor’s performance of pre-commissioning to achieve Instrument completion on a sub-system basis. • Approve the of contractor’s pre-commissioning and commissioning dossiers. • Follow up of contractor’s FAT activities at supplier premises. • Co-ordinates the preparation of instrument commissioning activities with all project entities/existing facilities • Develops a strategy in order to maximize onshore commissioning and minimize lost time due to interfaces, along with a commissioning sequence • Manages the preparation of pre-commissioning / commissioning procedures and reporting tools (including technical database, planning, punch list control). • Prepare and supervise the execution of instrument commissioning to maximize productivity, respect the schedule, minimize cost and achieve smooth hand over. • Follow up punch list register • Ensure that preservation is performed as per the procedures before FPSO sail-away -
Instrument Control Engineer at NORR SYSTEMS
Apr 2007 - Feb 2008• Norr system – Singapore provided Equipment Supply /Srervice support in Marine. Radar Tank Level system, Vessel Drafting system,cathodic protection system and Hydraullic control valves . • Maintenance & Repairing of Hydraullic control valves & Radar Tank level systems. • Over hauling, Calibration & Function test of Control Valves. • Simulation, loop testing, calibration of Radar Tank level & temperature transmitters • Carried out Effective trouble shooting in PLC Logic, Installation of software, back up… • Preparation of Maintenance report and Breakdown report. • Preparation of Factory Acceptance Procedure. -
Senior INstrument & Control Engineer at FORTUNE ENGINEERING AND ENERGY SERVCIES
Jun 2015Fortune Engineering awarded the Project of FPSO CYRUS- Topside Proces modules(Slug catcher,Seperator,Electrostatic,Produced water,Knock out drum)-Water Injection system,MGPS,Instrument Air Compressors,Crude Metering System,Cooling water system,Fresh Water Generators,Chemical Injectionsystesm . • Review/verification of Test-Packages compliance against the Project specifications, the Quality Plans, the Procedures and Inspection &Test Plans. • Punch-list issuing and verified Contractor's check list for the tests, mechanical completion/commissioning stages • Preparing work schedules • Directs the work of subcontractors involved in various activities and monitors the commissioning costs to enhance the overall efficiency within budgeting constraints. • Coordinating with Instrument Construction Supervisor to inspect actual condition if the instruments are properly installed and to be able to raise RFI for Loop checking and loop acceptance. • Involving in the functional tests, loop tests, calibration of the field instruments including activity prior to meet deadline of Commissioning of instruments. • Following all safety practices and procedures and corrected unsafe work practices. • Involving Skid Packages FAT/SAT inspection. 2. Project : ZADCO- UPPER ZAKUM –ACPT- Installation of Temporary Chemical loading line • Preparation of Installation and testing procedure • Preparation of Calibration & Function test records. • Ensure that the permit to work system is in place and following instruction from client representative. • Carrying out the instrument installation, according to the work plan • Simulation, functional loop testing, Calibration & Function test of valves
-
- Educations
-
-
Bachelor of Engineering
Electronics & Communication at ANNA UNIVERSITY2002 - 2006
-
Bachelor of Engineering
-
- Certifications
-
- BOSIET Sep 2015