- Superintendent / Foreman
-
- Plan and enforce E&I works according to schedule and specified target
- Lead contractor to maintain material and works quality/standards according to project specification.
- Do site coordination with other trades.
- Solve the site issue and material/tools issue.
- Responsible for the clearance for both in-house and clients punch list.
- Project involved: UZ750 EPC-2 (Zakum Development Company) island surface process facilities Module
- Skills
-
- Certified Internal Auditor ISO 9001:2000 9 years by 2008
- Shipyard safety induction course 1 years by 2016
- Employers
-
-
Electrical Inspector at Six Tee Offshore Project Services Pte Ltd
Apr 2014 - Sep 2016• Inspect Electrical incoming material and equipment follow technical agreement (TA) and project’s specification • Attend Yard MC inspection follow detail design drawing, project’s specification and Class standard (ABS) • Carry out onsite routine check and issue occurrence report (OR) to yard when found poor workmanship were implemented • Attend yard MC and commissioning inspection • Project involved: Blue Ocean 1 (Jack-up Drilling Rig CJ46-X100-D) -
Electrical Commissioning Engineer & Electrical Supervisor at Six Tee Offshore Project Services Pte Ltd
Feb 2011 - Mar 2014• Main contractor for Living Quarter system - EPCIC (Engineering, Procurement, Construction, Installation and Commissioning) • Monitor and control E&I construction and MC/Commissioning progress. • Distribute the details design drawing and shop drawing to construction team and lead them to complete the construction follow the project’s specification and class standard (DNV). • Conduct test/inspection with yard QC, Client and Class. • Commissioning system involved: Lighting switchboard, LQ lighting system, helideck lighting system, HVAC re-heater system, window glass heater system and fire damper system. • Project Involved: P448 Dalian Developer Drillship -
Commissioning Electrical Engineer at Drydocks World Graha
Jan 2010 - Jan 2011• Monitor the EC/MC package’s status. Check EC/MC packages cable installation and termination, cable and equipment tags are tally with detail design drawing and VCD. • Conduct commissioning test with client/class. • Clear commissioning punch list. Do equipment preservation after commissioning completed. • Knowledge on commissioning, trouble shooting, technical problem solving, repairs, handling of materials • Commissioning system involved: Jacking system, Fixation system, Cantilever skidding system, Main switchboard, Distribution board, Fire and Gas system, PABX, PAGA, CCTV and lighting system. • Project involve: Perro Negro 8 (3 Leg Jack-up Drilling Rig), Haven (4 Leg Service Jack) and Nora (4 Leg Service Jack)
-
- Educations
-
-
Bachelor Degree
Electrical and Electronic Engineering at University Malaysia Sabah2003 - 2007
-