Saturday, April 19, 2025
Jobs Resumes Post Resume Post Job
Back to Resumes List
Shipboard Officer / Personnel / Crew
     Offshore Hydrographic Surveyor / Senior surveyor with 10-years experience in offshore industry predominantly in the offshore oil and gas, subsea construction, dredging and reclamation, submarine cable laying and trenching, dive/ROV support
OPERATIONS
# Equipment installation, software adjusting, full vessel mobilization
# Equipment calibration (Gyrocompass, SBES, MBES)
# Pipe laying survey/Cable laying survey
# Side Scan Sonar survey
# MBE / SBE survey
# Construction & installation providing
# Bathymetry, Sea Level Monitoring (Tide Gauge)
# ROV & divers & subsea tools positioning  
# Data processing
# Reporting
# Charting
# Dredging control survey, calculate volume
# Dredging project management
# Tender procedure

# Preparation of presentations,    exhibitions, conferences, forums
KEY SKILS
# Multibeam echo sounder survey
# Equipment installation
# Equipment calibration
# Full vessel mobilization
# Control dredging
# Volume calculate
# Pipe laying survey/Cable laying survey
# Post processing data
# QINSy
# HYPACK
# SIS
# PDS2000
# Qloud
# Caris
# USBL / LBL
 
EMPLOYMENT
Dec. 2016 – dec. 2016 Position: Client Representative
Company: Patzold, Köbke Engineers GmbH & Co. KG
Client: Prysmian Group, Italy
Project: Netzanschluss Cluster Westlich Adlergrund
Unit: m/v “BoDo Connector”
Area: Lubmin, Germany
Equipment: Coda Octopus 3D Echoscope.
Software: EIVA
Responsibilities: Control of fibre optic cable laying in the trench, backfilling, dredging trench from ashore to the windmill park
Sept. 2016 – oct. 2016 Position: Multi beam operator
Company: Neptune Sp/f
Client: Terrasond, USA
Project: Oceans Melting Greenland
Unit: m/v “Neptune”
Area: Greenland , Northern Atlantic
Equipment: Reson SeaBat 7160, Navcom, Valeport RapidCTD, Teledyne Rapid CAST, AML Minos-X.
Software: QINSy, Caris , PDS 2000, SeaCast
Responsibilities: Multibeam beam survey, post processing data.
From October 2015 –june 2016 Position: Party Chief / Hydrographic Surveyor
Company: EUROMETRUS Ltd.  
Area: Finland gulf, St. Petersburg, Russia
Equipment: Trimble DGPS, Kongsberg EM3002, Kongsberg EA400, Octans MRU 3000, Seapath, Reson SeaBat 8101, Trimble 5700, Trimble R8, Valeport Mini SVS.
Software: QINSy, HYPACK, AutoCAD, SIS, Neptune,Seatex MRU, Qloud, PDS 2000, Terramodel
Responsibilities: Full vessel mobilization, multibeam and single beam survey, post processing data, volume calculated, reporting, charting
June 2011- October2015 Position: Party Chief / Hydrographic Surveyor
Client: FSUE “Rosmorport”  
Project: Extension of the Port Ust-Luga, control dredging area and channels
Area: Finland gulf, St. Petersburg, Russia
Equipment: Trimble DGPS, Kongsberg EM3002, Kongsberg EA400, Octans MRU 3000, Seapath, Reson SeaBat 8101, Trimble 5700, Trimble R8, Valeport Mini SVS.
Software: QINSy, HYPACK, AutoCAD, SIS, Neptune,Seatex MRU, Qloud, PDS 2000, Terramodel
Responsibilities: Full vessel mobilization, multibeam and single beam survey, post processing data, volume calculated, reporting, charting
May 2010 - June 2011 Position: Party Chief / Hydrographic Surveyor (Client Representative)
Client: Gazprom JSC
Project: Pipe laying in Baydaratskaya guba, Kara sea.
Unit: m/v Ivan Petrov
Area: Kara sea, Russia
Equipment: Trimble DGPS, Kongsberg EM3002, Kongsberg EA400, Octans MRU 3000, Seapath, Reson SeaBat 8101, Trimble 5700, Valeport Mini SVS.
Software: QINSy, HYPACK, AutoCAD, SIS, Neptune , Qloud, PDS 2000, Terramodel
Responsibilities: Control pipe and cable laying, full vessel mobilization, multibeam and single beam survey, post processing data, volume calculated, reporting, charting.
July 2008May 2010 Position: MBES Operator, Data processor, Party Chief
Client: MRTS JSC / Gazprom JSC
Project: Pipe and cable laying in Baydaratskaya guba, Kara sea.
Unit: AHTS “Kuban”
Area: Kara sea, Russia
Equipment: Trimble DGPS, Kongsberg EM3002, Kongsberg EA400, Octans MRU 3000, Seapath, Reson SeaBat 8101, Trimble 5700, Trimble DSM 232, Trimble R8, Valeport Mini SVS, USBL .
Software: QINSy, HYPACK, AutoCAD, SIS, Neptune, Qloud, PDS 2000, Terramodel
Responsibilities: Control pipe and cable laying, full vessel mobilization, multibeam and single beam survey, post processing data, volume calculated, reporting, charting.
September 2006 – June 2008 Position: MBES Operator, Data processor / Hydrographic Surveyor
Client: FSUE “Rosmorport”, Petrolesportr, LukOil, MRTS JSC
Project: MBE survey, SBE survey, geodetic survey
Area: Baltic sea, Kara sea, Barents sea, White sea, Angara river, Neva river, Russia
Unit: Survey boat
Equipment: Trimble DGPS, Kongsberg EM3002, Kongsberg EM3000, Kongsberg EA400 SBES, Octans MRU 3000, Seapath, Trimble 5700, Trimble DSM 232, Trimble R8, LBL .
Software: QINSy, HYPACK, AutoCAD, SIS, Neptune, Qloud,
Responsibilities: full vessel mobilization, multibeam and single beam survey, post processing data, volume calculated, reporting, charting, land survey.
Additional information Working skills: Leica TPS 410, Sokkia Set 610, 3ТА5, Simrad EA400 Simrad EM3000, Simrad EM3002, Seapath, Seatex MRU, Trimble 5700, Trimble R8, Trimble DSM 232, Valeport Mini SVS, USBL / LBL.
Working skills software: SIS, Neptune, Seatex MRU, Qloud, Autocad, Hypack, Topaz, Credo, Autodesk Land Desktop, Corel Draw, Surfer, MS Office, Adobe Photoshop, PDS 2000;

Links
View Contact Information
Marine Technology ENews subscription

World Energy News is the global authority on the international energy industry, delivered to your Email two times per week.

Subscribe to World Energy News Alerts.