Back to Resumes List
- Engineer / Naval Architect
-
DESIGNATION: Electronics Engineer NAME: NRIC NO.: NATIONALITY: Indonesian AGE: 59 MARITAL STATUS: Married ACADEMIC QUALIFICATIONS 1985 - Bachelor Engineering Graduated from STTN, Faculty of Electro, Jakarta Indonesia SKILL PROFILES Engineering, Design System, Maintenance and Trouble shoot. Telecommunication system, Radio Communication, Radio, Network and Communication, PAGA System, Alarm System, Instrumentation Control, CCTV system, PABX System., Ms. Office, Microsoft Project, Visio Technical Drawing, Server/Workstation, PC Hardware/Software and Networking. Fiber Optic System.
WORKING EXPERIENCE (IN CHRONOLOGICAL ORDER)
- Senior Project Engineer at PT. Megayasa Teknologi Indonesia 2007 - Present
- PT. Dwipa Lintas Express,Jakarta 1994 – 2004
(Cikampek to Padalarang)for facilities 1999 - 2003
- Site Manager Signaling &Telecomunication NSTO 1997 - 1998
- Site Manager for Fo Cable Excelcomindo Project 1996 – 1997
including to design and install radio VHF to cover all project area from Duku atas to Cikampek for project facilities
- Coordinator Signaling &Telecom CKY Project 1993 – 1996
Including to Design and Install Radio SSB and Radio VHF to cover Cirebon-Kroya-Yogya for project facilities- Westinghouse Break & Signaling Ltd, Jakarta
Support for Engineering Signalling and Telecomunication for Cirebon-Kroya-Yogya Railway- Amalgamated Instrument Co.Pty. Ltd, Turramurra, Sydney
- Centre Industri Ltd, Allambie High, Sydney
- STTN Electronics LAB - Jakarta 1987 - 1988
- CMC.PT Jakarta 1985 -1987
Medan – Jakarta – Semarang for office communicationCURRENT DUTIES AND RESPONSIBILITIES - Installing and Maintenance replacement PA/Paga Party System at CNOOC – Pabelokan (Kep. Seribu). - 2005
- Installation and Maintenance replacement PAGA System, Alarm System & Telephone system at Seadrill VI- EMP Kangean– Pagerungan 2006
- Installation, Testing and Commissioning PAGA System and Telephone system at Parameswara Rig (Global Santa Fe) – Balikpapan. 2006
- Testing and Commissioning Power Plant JEL - JURONG for PAGA System, Radio Communication VHF Motorolla and CCTV system at PLN – Tarahan Lot III and IV (Lampung). 2007
- Maintenance, Testing and Commissioning CCTV PGN Tanjung Belias, Jambi 2007
- Engineering PAGA System PT KIRIN MIWON FOODS, Kab.Lampung Timur 2007
- Testing and Commissioning Gas Plant SLEEC for PAGA M/I system at CNOOC – Pabelokan (Kep. Seribu). 2008
- Survey and Engineering for reinstallation Rani Woro Rig Apexindo,Gersik, Indonesia 2008
- Maintenance for FPSO Nova PAGA System ConocoPhillips, Belanak, Natuna Island.2008
- Testing and Commissioning Elemec+ and Temporary PAGA System WHP-C and WHP-D at North Belut ConocoPhillips, Natuna Island 2008
- Design Engineering, Fabrication and FAT for PAGA System Star Energy KG plat form and Testing and Communication for PAGA System Star Energy KG plat at Natuna Island.2009
- Engineering Elemec+ System for Oyong Development Project Phase II,Gersik, Indonesia 2009
- Engineering, Fabrication and FAT for PAEAS Banyu Urip EPF-2 Exxon Mobil Indonesia, Cepu, Indonesia 2009
- Integration Radio Crane Motorolla for Hess WHP-A Unjung Pangkah Gersik 2010
- Radio Motorolla Repeater CDR 500 configuration and Internal Acceptance Test 2010
- Engineering, Fabrication PAGA, PABX and LAN for Andritz KAREBBE Hidroelectric project, Sorowako South Sulawesi. 2010
- Integration Radio Motorolla to telephone system use Gai-Tronics ITA2000, IPE2500 for CNOOC Pabelokan communication.2011
- Engineering works for Installation Radio Microwave OPF Hess Ujung Pangkah Development Project 2011
- Test Comms PAGA Sulut 2x 25 MW Power Plant SULUT 2012.
- FAT Andritz project for PAGA system at Karebe Sulawesi Tengah 2012
- FAT Radio system at Omega Ltd Singapore for Ruby Project 2012
- Trouble shooting PAGA - NOVA system Belanak FPSO- Conoco-Phillip Indonesia, 2012
- Bukit Tua Project For Radio and CCTV system 2013 – 2014 – support Meindo project Pretronas Field Bukit-Tua.
- Kerendan Project for PAGA system Elemec 3 and CCTV system Coex 2014 -2016 support Meindo for Kerendan Project - Salamander Kalaimantan.
- Ario Damar Project for PAGA system 2015-2016 support Syinergy for Tropika Energy Petroleum.
- Sumpal PAGA system Elemec 3 and CCTV Coex 2015 – 2016 support Rekind for ConocoPhillips Sumpal Project.
- Jangkrik Project Elemec 3 and CCTV Coex support SAIPEM for FPSO Jangkrik 2016 - 2017
- Revamping NOVA PAGA System at PT.Medco - Belanak FPSO site 2017-2018
- Monitoring Project for All system telekomunication PAGA and CCTV system 2018 -
TRAINING/COURSE :
- 2007 : Gai-Tronitcs ELEMEC System Training at OMEGA, Singapore
- 2007 : T-BOSIET for Safety Training, Jakarta
- 2008 : MS Project at OMEGA, Singapore
- 2009 : CORNING Fibre Optic, Jakarta
- 2009 : Gai-Tronics NOVA System, Milan – Italia
- 2010 : PELCO CCTV for CM9700, Singapore
- 2013 : Nautel NDB VR 125 – Hacketts Cove, Canada
- 2014 : Elemec 3 Gai-tronics PAGA system – Kuala Lumpur, Malaysia.