Ø WORKING EXPERIENCE:

 (1)     TECHNO POWER ENTERPRISE (P) LTD, (RAUSHEENA GROUP)

  • Designation:                 SEINER. ENGINEER (Electrical)
  • Duration:                     20 JUNE 2016 to Till Date.

Present Project: - RURALELECTRIFICATION WORK UNDER RGGVY12thSCHIEME & DDUGJY,

               Functional Area: - Erection & commissioning of 33/11kv Substation.

                      Key Role           1) Testing for all Equipment.

                                           2)  Erection Steel Structure,HT TRFO, HT & LT Outdoor Indoors CB & Control

                                              Panel, Power & control cable lying. Battery & Battery Charger Panels,     

                                              Capacitor bank.Earthig work,

                                            3)  Control & Power cable Schedule pepper,

                           4) Sub-Station Illumination work,

                                            5) All Equipment Civil Foundation work.  

                                            6). Daily supervision of work progress of Sub-Contractor.

                                7). Sub-Contractor bill checking.

                                        8) Site jmc 

.Project Details;-

                                    SUBSTATION & RURAL ELECTRIFICATION OF 33/11K V SHEOHAR & MUZAFFAR PUE DISTRICT. (BIHAR),       

CLINT:-NORTH BIHAR POWER DISTRIBUTION COMPANY LIMITED,

CLINT:- Jharkhand Bijli Vitran Nigam Limited ( Ramgarh,Jharkhand)

 (2)      ElectricalManufacturing Company (EMC) LTD.

  •            Designation:-  ASST. ENGINEER (Electrical)
  •            Duration:-   15 November 2010 to 10 JUNE 2016

(A) PreviousProject: - 765/400KV SALEM POOLING (NEW) (AIS) S/S

             * Functional Area: - Testing& commissioning of 765/400kv Substation.

                    Key Role                 1) Testing for all Equipment.

                             2), HT Cable, LT Cable (Power, Control) Laying,

.                                            3). Daily supervision of work progress of Sub-Contractor.

                                 4). Site problem solving.

                                       5). Sub-Contractor bill checking.

                           6) Sub-Station Illumination work,

       .Project Details;-

                                              SUBSTATION PACKAGE B239FOR CONSTRUCTION OF 765/400kV DHARMAPURI, INDUR. (TAMIL NADU),       

                CLINT:-POWER GRID CORPORATIONOF INDIA LIMITED,

(A GOVERNMENT OF INDIA ENTERPRIS),

  • (B) Previous Project: 400/220KV CHAIBASA (NEW) (AIS) S/S

             * Functional Area: -Testing& Commissioning of 400/220kv Substation.

  • Key Role:                   1). 400KV 8 NOS BAY & 220KV 8 NOS BAY, 315MVA AUTO
  •                                         TRFO-2 NOS ,80 MVAR REACTOR-1 NOS,

                                     2) Testing for all Equipment.

                                     3), HT Cable, LT Cable (Power, Control) Laying,

.                                                     4). Daily supervision of work progress of Sub-Contractor.

                                           5). Sub-Contractor bill checking.

                                       6) Sub-Station Illumination work,

.Project Details;-

                                              SUBSTATION PACKAGE B2 FOR CONSTRUCTION OF400/220kV CHAIBASA (NEW) S/S ASSOCIATED WITHEASTERN REGION STRENGTHENING SCHEME III (JHARKHAND),       

CLINT:POWER GRID CORPORATIONOF INDIA LIMITED,

(A GOVERNMENT OF INDIA ENTERPRIS),

(C)Previous Project: 132/33KV GIS SUBSTATION,

Functional Area: -      Erection & Commissioning of 132/33KV GIS Substation.

                Key Role   1) Erection for all Equipment.

  •            2) Testing for all Equipment.

            3), HT Cable, LT Cable (Power, Control) Laying,

            4) Sub-Station Illumination work,

.                           5). Daily supervision of work progress of Sub-Contractor.

                      6). Sub-Contractor bill checking.

Project Details; - 132/33 KV GIS SUBSTATION MATHABHANGA COOCHBEHAR.  

                                        (WEST BENGAL),       

                                132/33 KV GIS SUBSTATION NAZIR PUR NADIA. (WEST BENGAL),         

CLINT:West Bengal State Electricity Distribution Company Limited,

  •  
  • (D) Previous Project: -   33/6.6 KV (VCB) Substation.
  • Functional Area: - Erection & Commissioning of 33/6.6KV Substation.
  • Key Role:                   1). Erection Planning as per Drawing.

                                     2).Erection of HT Transformers, LT Transformers, HT Panels,

                                                          LT Panels, HT Cable, LT Cable (Power, Control) Laying,

                                                          Battery & Battery Charger Panels, SCADA Panels, Capacitor

                                                          Bank, Air Core Reactors, Lightning Arrestors, HT & LT Bus Duct.

                                           3). Daily supervision of work progress of Sub-Contractor.

                                           4). Scads control system checking,

                                           5). Site problem solving.

                                                 6). Sub-Contractor bill checking.

             7). Consult with Client (ISP), Consultant (MECON LTD),

                 Equipment Supplier (AREVA, PCC, ECC Engineering)                  

.Project Details;-

Power Distribution Package-22 in Extension of 2.5 MT Production unit IISCO Steel Plant, Burnpur under Steel Authority of India Ltd. (WEST BENGAL)

 (3)      AREVA T&D INDIA   LTD,(SALT LAKE .KOLKATA) ,

  • Designation:                   SUPERVISOR  (Electrical)
  • Duration:                      19 November 2006 to 10November2010.

                  *Functional Area:PIX 33 KV& HWX 11 KVVacuum circuit breaker assembly & site servicing, 

                                             33 KV & 6.6 KV Panel wiring & Testing,

Ø TECHNIQUAL QUALIFICATIONS:

              Diploma (Electrical) from Central Calcutta Ploy technic. W.B

                Government License (Electrical -1, 2, 11,6a.6b.7a.7b) W.B

Ø ACADEMIC QUALIFICATION

               1. Passed Higher Secondary from (W.B.C.H.S.E),

2.  Passed matriculation Examination from (W.B.B.S.E).

Ø PERSONAL INFORMATION:

  1. Date of Birth : 07/03/1982
  2. Father’s Name: FULCHAND SAROJ
  3. Marital status: Marred
  4. Language known: Bengali.   Hindi.  English,

                                      DECLARATION

The above written statement is true and honest to the best of my knowledge. If the opportunity is given to me I will try my best under the rules and regulations of your organization.

View Contact Information