Back to Resumes List
- Project Engineering / Project Management
-
Dear Sir/ Madam,
I am a Graduate (B.TECH) in Electrical and Electronics Engineering with 3 years’ experience in project EPC, Non-EPC and 220Kv transmission lines plan and works execution, 6 months experience in commissioning and 8 months experience in maintenance of 220KV Switchyard and 388MW capacity of Pioneer Gas Power limited, Pune,Maharashtra.
I have GE9FA Gas Turbine commissioning experience and gained sound knowledge on Gas Turbine & Steam Turbine, Heat recovery steam generator, Generators (up to 318 MVA), Gas turbine starting device LS2100, Power & Distribution Transformers (up to 300 MVA), Switch yard (220 KV), Switch gear (6.6/0.415 KV), Motors (up to 1.85 MW), VFD's, EDG/SDG, UPS, Battery chargers & Batteries, Gas turbine, Steam turbine & HRSG auxiliary drives.
Worked with PTW system, First Aid, Industrial Safety & Fire Fighting and Emergency plan procedures
I also believe that my experience in Electrical department would bring an additional advantage to solving challenges and providing solutions. Here I am Enclosed resume reflects my experience and accomplishments.
Looking forward to hear from you and thank you in advance for your time, consideration and forthcoming response.
I am presently associated with Pioneer Gas Power Limited (Electrical Maintenance Department) in Pune as an Electrical Engineer.
- Employers
-
-
Electrical engineer at Pioneer Gas power LTD
Jan 2013
-
- Educations
-
-
B.tech
EEE at KCEA2008 - 2012
-
B.tech
-
Jagityala, Telangana,