Saturday, November 23, 2024
Jobs Resumes Post Resume Post Job
Back to Resumes List
Project Engineering / Project Management

Dear Sir/ Madam,

I am a Graduate (B.TECH) in Electrical and Electronics Engineering with 3 years’ experience in project EPC, Non-EPC and 220Kv transmission lines plan and works execution, 6 months experience in commissioning and 8 months experience in maintenance of 220KV Switchyard and 388MW capacity of Pioneer Gas Power limited, Pune,Maharashtra.

I have GE9FA Gas Turbine commissioning experience and gained sound knowledge on Gas Turbine & Steam Turbine, Heat recovery steam generator, Generators (up to 318 MVA), Gas turbine starting device LS2100, Power & Distribution Transformers (up to 300 MVA), Switch yard (220 KV), Switch gear (6.6/0.415 KV), Motors (up to 1.85 MW), VFD's, EDG/SDG, UPS, Battery chargers & Batteries, Gas turbine, Steam turbine & HRSG auxiliary drives.

Worked with PTW system, First Aid, Industrial Safety & Fire Fighting and Emergency plan procedures

I also believe that my experience in Electrical department would bring an additional advantage to solving challenges and providing solutions. Here I am Enclosed resume reflects my experience and accomplishments.

Looking forward to hear from you and thank you in advance for your time, consideration and forthcoming response.                

I am presently associated with Pioneer Gas Power Limited (Electrical Maintenance Department) in Pune as an Electrical Engineer.

Employers
  • Electrical engineer at Pioneer Gas power LTD
    Jan 2013
Educations
  • B.tech
    EEE at KCEA
    2008 - 2012
Jagityala, Telangana,
View Contact Information