- QA/QC
-
•Address : Republic of Korea. 250, Bongsu-ro, Dong-guUlsan
•Nationality : South Korean
•Date of Birth : June, 15, 1984
•Objective : Important things of Inspector is skill and judgment. But the most of Important thing is hardworking and honesty working. Also,
Technically Inspector is always must have to do find a portential risk and must have to Highly critical thinking to do Inspection.
•Education :
*MAR. 2003~FEB.2007 Busan Kyung Sung University Electrical and Electron Engineering
*MAR. 2000~FEB.2002 Information& Communication High School - Electrical
•Language :
*GoodEnglishcommunication skills
*OrdinaryEnglishwriting skills
•Qualification& License :
- certificate & certification
-International certificate-
1) Installation and Maintenance of Ex Equipment in ATEC
2) Certificate for Electrical and Instrumentation Engineering in IDC Technologies
3) ATEX- Ex certification – Ex installations guide according to IEC 60079-14&17 and IEC 61892-7
- Potentially explosive atmospheres
- Area classification
- Explosion theory
- Equipment- and gas groups
- Methods of protection
- Marking of equipment
- Temperature classes
- IP classes
- Ex motors
- Cables
- Glands
- Earthing
4) ATEX- FSE 2013 Low-voltage and high-voltage certification in Trainor
5) IEC 61508 / ANSI/ISA-S84.01 - SIL<Safety Integrity Level> Certification in South Korea Gas safety Corporation.
6) ATEX /PED Directives in TrainingPortal
7) IEC Ex & ATEX Approved – HAZARDOUS AREA AND EX EQUIPMENT INSTALLATION in Atex Inspections Ltd.
- MODULE 1: INTRODUCTION TO HAZARDOUS AREAS
- MODULE 2: Ex EQUIPMENT FOR HAZARDOUS AREAS
- MODULE 3: INSPECTION AND MAINTENANCE IN HAZARDOUS AREAS
8) HAZARDOUS AREA INSTRUMENTATION in Abhisam
- Basic Concepts of Hazardous Areas & Materials
- Area, Material and Temperature Classification
- International Standards related to Hazardous Areas
- Methods of Protection (including Explosion proof, Intrinsic Safety, Pressurization, Increased Safety & others)
- Fieldbus in Hazardous Areas
- Certification & Labeling (including ATEX requirements)
- Inspection and Maintenance
9) NORSOK Standard Z-015 <Temporary equipment> Certification in Trainor
Relation between the regulations and NORSOK : Definitions and roles : Requirements regarding fire, gas, and safety : Requirements for electrical installations : Interface with facility : Safety equipment for diesel engines :Technical documentation
10) PERMIT TO WORK PTW –in DOF GROUP (CPD Certified)
11) IECEx Appoval Hazardous Area Awarence certificate in Competency Training
IECEx System Rules and IECEx OD 521 Procedures – Assessment conducted by Competency Training.
- Ex000_Basic knowledge and awareness to enter a site that includes a classified hazardous area
- Ex001_ Apply basic principles of protection in explosive atmospheres
12) CompEx Certificatio EX01, EX02, EX03, EX04, certificate no. 49849
13) EEHA Certification in Plumpton Group for Electrical Equipment for Hazardous Areas awards
14) Electrical Approval Certificate in Apave International
For H0 SITE MANAGER and B0 SITE MANAGER ref No.525977
15) Start -Up and Modification of the “Functional Safety” SIL - Safety Integiry Level in TUV NORD
•PROFESSIONAL EXPERIENCE
- Supervising E&I Construction
- cable tray Check activity
- cable pulling Check activity
- E&I panels` installation Check activity
- E&I junction boxes installation Check activity
- E&I cable termination activity for the E & I equipment Check activity
- Installation of the transformers Installation of the cable tray (LV and HV) Check activity
- Cable terminations Check activity
- Cable testing : continuity & Megger Test and Hi Pot Test(for HV cables) Check activity
- heat tracing Check activity
- supporting the commissioning requirements and cooperating with the Quality Department;
- Quality Control Inspection, Testing and correctly documentation(ITR,MC Check sheet) to ensure correct and proper installation of all the field Instruments, Junction Boxes ,Cable Tray, Marshalling Panels, DCS, (Yokogawa, Honeywell and Siemens) Control Panels
- Receiving inspected to Instrument Equipment also, documentation. <Panel>
-Involved in FAT(Factory Acceptance Test) & SAT(Site Acceptance Test) Activities
- Inspection the equipment and devices used in the project meets the required specifications per project requirements, Standard and tested in accordance with the procedures.
-Inspection for field and Control System Wiring termination, in accordance to Project approved Drawings
- Inspection of Electrical Equipment function test and Illumination level testing of lighting system.
- Inspection of E&I installation cabinet Monitoring control cabinet wiring, Termination, cable routing & cable tray installation.
- Inspection of Switch Gear Panel installation, Cable Termination and Bus bar torque.
- Installation of control panel marshalling panels and termination continuity and Meggar test .
- Inspection of Ground Rod and Grounding cable, as per Engineering Specification.
- Write of Electrical Inspection Reports
- Inspection of Heat Tracing panel Installation, Junction Box Installation and Heat tracing cable laying and Meggar test
- Vendor Package Inspection.
- Witness of Motor Test
- ATEX equipment Inspection for (Instrument equipment.)
- Quality Control Inspection, Testing and correctly documentation(ITR,MC Check sheet) to ensure correct and proper installation of all the field Instruments, Junction Boxes ,Cable Tray, Marshalling Panels, DCS, (Yokogawa, Honeywell and Siemens) Control Panels
- Receiving inspected to Instrument Equipment also, documentation. <Panel>
-Involved in FAT(Factory Acceptance Test) & SAT(Site Acceptance Test) Activities
- Inspection the equipment and devices used in the project meets the required specifications per project requirements, Standard and tested in accordance with the procedures.
-Inspection for field and Control System Wiring termination, in accordance to Project approved Drawings
- Inspection of Electrical Equipment function test and Illumination level testing of lighting system.
- Inspection of E&I installation cabinet Monitoring control cabinet wiring, Termination, cable routing & cable tray installation.
- Inspection of Switch Gear Panel installation, Cable Termination and Bus bar torque.
- Installation of control panel marshalling panels and termination continuity and Meggar test .
- Inspection of Ground Rod and Grounding cable, as per Engineering Specification.
- Write of Electrical Inspection Reports
- Inspection of Heat Tracing panel Installation, Junction Box Installation and Heat tracing cable laying and Meggar test
- Vendor Package Inspection.
- Witness of Motor Test
- ATEX equipment Inspection for (Instrument equipment.)
2. Education Completion
1) HYUNDAI HEAVY INDUSTRIES CO.LTD <Inspector Education>
offshore plant & gas & Oil platform - <1Electric 2. Instrument 3.Explosion Safety>
2) HYUNDAI HEAVY INDUSTRIES CO.LTD <Control Education>
Industrial Robot & Mechanical operatingand control - <1.Commissioning 2. Machine through the remote Control teaching>
-International education & training certificate-
1)Equinor Values – English Version
2) Hazardous Area Cable Gland Installation awareness <CMP Products>
-Korea certificate-
1) Design Engineers certification
2) Certificate of internet, Microsoft Word, Excel, PowerPoint, Access, and Outlook
• Achievements:
*Special award from the Korea Design contests Competition
* Personal computer contests technology, South Korea passed the test
• Experience :
MAY.2018~Present
Wood. Group MUSTANG (Wood plc)
Location : DSME Okpo & DSHI Shinhan & Honeywell factory in Cheonan
Project : TengizChevrOil(TCO) FGP Project
# Electrical & Instrument QC Inspector
- Carry out the Monitoring build of cabinets against approved drawings, issued specifications and approved Inspection & Test Plans
- Carry out the Marshalling & System cabinet inspection at Cheonan Honeywell Factory. with Honeywell QC engineer.
- Raising punch lists Issue and closed
- Reported to the UK based Project QC Lead Coordinator and it’s shared with Fabrication Team of Honeywell, Project Test Team of Honeywell, Responsible QA Engineer of Honeywell, Client Quality Engineer(TCO)
- Carry out PAS,DCS,SIS,ICSS,ESD,FGS,NETWORK, system automation cabinet packing works.
- Carry out an Custom Inspection , FAT, Preservation, Cabinet packing works. it's Shipping Transferred- to Warehouse
- Bill of material <MRB> & label identification(tag) checked
- RIE of each cabinet Visual inspection <mechanical damaged also, scratch ,size>
- Preservation labels fixed ,Toxicological data sheets attached ,Corrosion inhibitor installed, Storage,Transport protrection implemented ,Ship loose items marked and preserved ,Equipment enclosures sealed off confirm, Periodical preservation carried out.,Shock watch and tilt indicators fitted check.
MAY.2016~AUG 2017
Location :SHI , SAMSUNG HEAVY INDUSTRIES CO.LTD <Geo Je>
Project :NIGERIA – <Company> TOTAL -EGINA FPSO--
# Electrical & Instrument Construction Inspector
- Electrical & Instrument Equipment installation check. according to Company approved DWG
- Electrical Heat Tracing Inspection for before <Heating cable taping works> & after<Insulation & paint> Inspection. on Straight pipe & flange ,Elbows ,Tee , Valves , Support*Power connection kit & T-Splice kit inside terminal block and heat cable check & Heat tracing cable megger test
- Pre-commissioning Inspection.
- according to specification cable tray support and Punch and Ladder tray for check and Inspection <vibration,Installation,Mechanical damaged,Obstruction> check
- According to Specification
- FLUORSCENT & FLOOD Lighting & Ceiling type compact Lighting & Junction BOX & Socket Outlet inspection
- Living Quarter side Motor and space hearter cable Meggar & continuity test inspection
- LQ of HVAC System AIR tubing pipe line Leak test & Pipe line check & inspection.
- Helideck side Lighting and cable inspection
10. LQ each by deck Elec-service room inside of EDB such as Lv power cable Megger & continuity test , circuit breaker , EDB PANEL component test and inspection
11. make a daily mornitoring REPORT <risk element , improvement point>
12. Non- Hazardous area LQ & HUll side each by deck area completion visual inspection
13. Review a MCCR&(ITP) & Punch list
14. TRANSFORMER INSTALLATION INSPECTION &TEST
MAY.2014~APR.2016
Location : HHI , HYUNDAI HEAVY INDUSTRIES CO.LTD <ULSAN>
Project :North Sea – <Company> BP -Q204 FPSO & Clair ridge Platform-
# Electrical & Instrument & Tellecom & Ex (Atex) Inspector
- Electrical & Instrument Equipment installation check. according to Company approved DWG
- using a ShareCat PJT process system
- Electrical Heat Tracing Inspection for before <Heating cable taping works> & after<Insulation & paint> Inspection. on Straight pipe & flange ,Elbows ,Tee , Valves , Support*Power connection kit & T-Splice kit inside terminal block and heat cable check & Heat tracing cable megger test
- Power connection kit & T-Splice kit inside terminal block and heat cable check
- PAGA and Beacone equipment Inspection.
- Living Quarter side Motor and space hearter cable Meggar & continuity test Inspection
- LQ of HVAC System AIR tubing pipe line Leak test & Pipe line check & Inspection.
- Helideck side Lighting and cable inspection
- LQ each by deck Elec.service room inside of EDB such as Lv power cable Meggar & continuity test , circuit breaker , EDB PANEL component test and inspection
10. make a daily mornitoring REPORT <risk element , improvement point>
11. Non- Hazardous area LQ side each by deck area completion visual inspection
12. F&G System–Installation Checkfor equipmentassociated withF&G <Detecter,Alram,MAC.……>Check
13. Review a MCCR&(ITP) & Punch list
# ATEX- Ex Inspection
* EX Inspection Equipment, Mechanical completion A-check record make a complete
* EX register and EX certificate and vendor data & drawing EX installation inspection completed
* Top side, Hull side, HVAC side, living quarter side EX equipment inspection completed
* HHI on-shore yard EX equipment installation inspection
* Publish a Punch A&B make a completed.
JUNE.2013~MAY.2014
Location : HHI , HYUNDAI HEAVY INDUSTRIES CO.LTD <ULSAN>
Project :NORWAY – <HHI> STATOIL -Goliat FPSO--
# Electrical & Instrument & Tellecom Construction Inspector
- Electrical & Instrument Equipment installation check. according to Company approved DWG
- using a ProCoSys PJT process system
- LER,CER,CCR,TER Inside a Panel of the E&l&T cable and Equipment Inspection.
- Electrical Heat Tracing Inspection for before<Heating cable tape> & after<Insulation & paint> Inspection on the (Straight pipe & flange ,Elbows ,Tee , Valves , Support)
- Power connection kit & T-Splice kit inside terminal block and heat cable check
- according to specification cable tray support and Punch and Ladder tray Observation and Inspection <vibration,Installation,Mechanical damaged,Obstruction> check
- EDB Circuit and roof check test and inspection
- Tubing pipe line - leak test & Package system leak test
- AssociatedyardTubing pipe andinstrumentEquipment inspection
10. Mccr panel & junction box cable leading to checks and tests
11. High-voltage Hi-pot test cable and low voltage meggar test & point to point test cables and multi-cable checks and tests
12. Tellecom - PAGA System & Fiber optical cable & vendor cable inspection – OTDR Test list checks
13. Lighting cable and Equipment and circuit test and inspectrion.
14. F&G System–Installation Checkfor equipmentassociated withF&G <Detecter,Alram,MAC.……>Check
15. Review a MCCR&(ITP) & Punch list
# ATEX- Ex Inspection & Coordination
* EX check sheet E18A make a completed.
* EX Inspection Equipment, Mechanical completion A-check record make a complete
* EX register and EX certificate and vendor data & drawing EX installation inspection completed
* Top side, Hull side, HVAC side, living quarter side EX equipment inspection completed
* HHI on-shore yard EX equipment installation inspection
* Publish a Punch A&B make a completed.
MARCH.2013~JUNE.2013
Location : HHI , HYUNDAI HEAVY INDUSTRIES CO.LTD <ULSAN>
Project :QATAR – <Company> RASGAS -Barzan Gas Platform-
# Electrical & Instrument & Tellecom Construction Inspector
- Electrical & Instrument Equipment installation check. according to Company approved DWG
- Electrical Heat Tracing Inspection for before<Heating cable tape> & after<Insulation & paint> Inspection on the (Straight pipe & flange ,Elbows ,Tee , Valves , Support)
- Power connection kit & T-Splice kit inside terminal block and heat cable check
- Heat tracing cable megger test
- Strong English communication skills
- EDB Circuit and roof check test and inspection
- Tubing pipe line - leak test & Package system leak test
AssociatedyardTubing pipe andinstrumentEquipment inspection
- Mccr panel junction box cable leading to checks and tests
High-voltage cable and low voltage cables and multi-cable checks and tests
- Tellecom - PAGA System & Fiber optical cable & vendor cable inspection – OTDR Test list checks
10. Lighting cable and Equipment and circuit test and inspectrion.
11. F&G System–Installation Checkfor equipmentassociated withF&G <Detecter,Alram,MAC.……>Check
12. Review a MCCR&(ITP) & Punch list
APR.2012~OCT.2012
Location : HHI , HYUNDAI HEAVY INDUSTRIES CO.LTD <ULSAN>
Project : Myanmar – <Company> Daewoo International -SHWE GAS Platform-
# Electrical & Instrument & Tellecom Construction Inspector
- Electrical & Instrument Equipment installation check. according to Company approved DWG
- LER,CER,CCR,TER Inside a Panel of the E&l&T cable and Equipment Inspection.
- Strong English communication skills
- EDB Circuit and roof check test and inspection
- Tubing pipe line - leak test & Package system leak test
- AssociatedyardTubing pipe andinstrumentEquipment inspection
- Mccr panel junction box cable leading to checks and tests
- High-voltage cable and low voltage cables and multi-cable checks and tests
- Tellecom - PAGA System & Fiber optical cable & vendor cable inspection – OTDR Test list checks
10. Lighting cable and Equipment and circuit test and inspectrion.
11. F&G System–Installation Checkfor equipmentassociated withF&G <Detecter,Alram,MAC.……>Check
12. Review a MCCR&(ITP) & Punch list
JUNE.2011~NOV.2012 Commissioning
Location : Europe Czechoslovakia
Europe Czechoslovakia -
- vendor package & Mechanical equipment Inspection & operating
<Commissioning,Mechanical vendor package Electric equipment inspection>
OCT.2010~MAY.2011
Location : HHI ,HYUNDAI HEAVY INDUSTRIES CO.LTD <ULSAN>
Project :Australia -<Company> Woodside -NR2 GAS Platform-
# Instrument & Electrical & Tellecom Inspector
- Electrical & Instrument Equipment installation check. according to Company approved DWG
- Electrical Heat Tracing Inspection for before<Heating cable tape> & after<Insulation & paint> Inspection on the (Straight pipe & flange ,Elbows ,Tee , Valves , Support)
- Power connection kit & T-Splice kit inside terminal block and heat cable check
- Heat tracing cable megger test
- Strong English communication skills
- EDB Circuit and roof check test and inspection
- Tubing pipe line - leak test & Package system leak test
- Associatedyardpiping andinstrumentEquipment inspection
- Mccr panel junction box cable leading to checks and tests
10. High-voltage cable and low voltage cables and multi-cable checks and tests
11. Tellecom - PAGA System & Fiber optical cable & vendor cable inspection – OTDR Test list checks
12. Lighting cable and Equipment and circuit test and inspectrion.
13. F&G System–Installation Checkfor equipmentassociated withF&G <Detecter,Alram,MAC.……>Check
14. Review a MCCR&(ITP) & Punch list
OCT.2007~MAY.2009
Location : HHI , HYUNDAI HEAVY INDUSTRIES CO.LTD <ULSAN>
Project : ANGOLA -LNG Plant-
# Instrument & Electrical & Tellecom Inspector
- Electrical & Instrument Equipment installation check. according to Company approved DWG
- according to specification cable tray support and Punch and Ladder tray for check and Inspection <vibration,Installation,Mechanical damaged,Obstruction> check
- Strong English communication skills
- EDB Circuit and roof check test and inspection
- Tubing pipe line - leak test & Package system leak test
- Associatedyardpiping andinstrumentEquipment inspection
- Mccr panel junction box cable leading to checks and tests
- High-voltage cable and low voltage cables and multi-cable checks and tests
- Tellecom - PAGA System & Fiber optical cable & vendor cable inspection – OTDR Test list checks
10. Lighting cable and Equipment and circuit test and inspectrion.
11. F&G System–Installation Checkfor equipmentassociated withF&G <Detecter,Alram,MAC.……>Check
12. Review a MCCR&(ITP) & Punch list
- Skills
-
- ATEX / CompEx Inspection 10 years by 2019
- Employers
-
-
E&I Inspector at Wood.
May 2018 - Jun 2019MAC QC Inspection -
E&I Inspector at Total E&P
May 2016 - Aug 2017Hull Electrical & Instrument & Tellecom Inspection -
E&I Inspector at BP
May 2014 - Mar 2016FPSO & Gas Flatform QA/QC Inspection
-
- Educations
-
-
Bachelor Degree
Electrical & Electronics Engineering at Kyungsung University2004 - 2008
-
Bachelor Degree
-
- Certifications
-
- Electrical and Instrument Engineering Oct 2017
- CompEx 01-04 Sep 2015
- EEHA Aug 2015
-
Ulsan, Ulsan,