Saturday, November 23, 2024
Jobs Resumes Post Resume Post Job
Back to Resumes List
Engineer  / Naval Architect

ARMADA TPCE (M) SDN BHD (January 2018 – present)

Menara Tan & Tan, Kuala Lumpur

  • PROVISION OF FACILITIES IMPROVEMENT TECHNICAL SERVICES FOR PM8E FOR ENQUEST
    • Responsible in preparing & completing PM8E ME-350 Crane preservation work structural integrity report.
    • Updating SACS model for Seligi A Compression and prepare Inplace Analysis.

 

  • PROVISION OF FCILITIES IMPROVEMENT PROPOSAL (FIP) ENGINEERING AND PROJECT INTERFACE SUPPORTS SERVICES FOR PETRONAS CARIGALI SARAWAK OPERATION (SKO)
    • Responsible in preparing & completing Deck extension Lifting Analysis Report, Detailed design for Baronia- B Complex instrument Air System Upgrade.
    • Responsible in preparing & completing Topside Inplace Analysis Report, Detailed design for Baronia- B Complex instrument Air System Upgrade.

 

 

RNZ INTEGRATED (M) SDN BHD (Nov 2010 – December 2017)

Menara Great Eastern, Kuala Lumpur

  • PROVISION OF REVISIT DETAILED DESIGN ENGINEERING SERVICES FOR KINABALU NON ASSOCIATED GAS (NAG) PHASE II
    • Responsible in preparing & completing Transportation Analysis for Module 6.

 

  • PROVISION OF DETAILED DESIGN ENGINEERING SERVICES FOR SK310 B15 DEVELOPMENT
    • Responsible in preparing & completing Topside Weight Control Report for B15 Platform.
    • Responsible in preparing & completing Topside Weight Control Report for B15 Platform.
    • Responsible in preparing & completing B11RD Substructure Miscellaneous Analysis and design report.
    • Responsible in preparing & completing B11RD Topside Miscellaneous Analysis and design report.

 

  • PROVISION OF FEED AND EPCIC OF WELLHEAD PLATFORMS (WHP) FOR BOKOR PHASE 3 RE-DEVELOPMENT PROJECT, ENHANCED OIL RECOVERY
    • Responsible in preparing & completing Topside Weight Control Report for BODP-E & BODP-F Platform.
    • Responsible in preparing & completing Topside Weight Control Report for BODP-D Platform.
    • Responsible in preparing & completing Substructure Weight Control Report for BODP-E & BODP-F Platform.
    • Responsible in preparing & completing Substructure Weight Control Report for BODP-D Platform.

 

  • PROVISION OF STRUCTURAL INTEGRITY ASSESSMENT AND LOAD MONITORING FOR PETRONAS CARIGALI SDN. BHD. - SARAWAK OPERATIONS (PACKAGE 1)
  • Responsible in preparing & completing Model Report for BEP-A Platform.
  • Responsible in preparing & completing Static Inplace Analysis and Soft Mooring Assessment Report for BEP-A Platform.
  • STRUCTURAL ENGINEERING REVERIFICATION FOR GARAGOL DENIZ WEST OFFSHORE FACILITIES OIL DEVELOPMENT PROJECT
  • Responsible in preparing & completing the Pile Drivability Analysis Report
  • Provision of FEED Services for SKR-A, Pipelines and HTI for KasaWARI GAS DEVELOPMENT PROJECT
  • Responsible in preparing & completing the SKR-Topside Geometri Computer Model Analysis Report.
  • Responsible in preparing & completing the SKR-Topside Load Formulation Report.
  • Responsible in preparing & completing the SKR-Topside Inplace analysis Report.
  • Responsible in preparing & completing the SKR-Topside Loadout analysis Report.

 

  • SACS Model Updating & Integrity Assessment for 10 Platforms
  • Responsible in preparing & completing the EWDP-B Structural Model Analysis Report.
  • Responsible in preparing & completing the EWDP-B Structural Inplace Analysis Report.

 

  • Provision of Front End Engineering Design (FEED) for MAGTYMGULY gas Recycling Development Project.   
  • Extract Support reaction under service condition from all building and pipe rack structural analysis output and subsequently applied into foundation design calculation accordingly.
  • To perform Pipe rack analysis using STAAD PRO
  • To perform  structural and foundation analysis using STAAD PRO

 

  • Provision of Engineering, Procurement, Construction, Hook Up and construction (EPCC) of Garagol Deniz West Offshore Facilities for Garagol Deniz West oil Development Project
  • Responsible in preparing & completing the GDDP-A Boat landing and Boat Impact Analysis Report.
  • Responsible in preparing & completing the GDDP-A Miscellaneous Report.
  • Responsible in preparing and handling Structural Procurements for GDDP-A.
  • Responsible in handling and reviewing Vendor documents during VDI/VDR Stage.
  • Preparing & Updating Steel Specification for GDDP-A.
  • Preparing & Updating Grout Seals Specification For GDDP-A
  • Preparing & Updating Diaphragm Closure Specification for GDDP-A.
  • Preparing & Updating Painting & Coating Specification for GDDP-A.
  • Preparing & Updating Shock Cell Specification for GDDP-A.
  • Preparing & Updating Pile Gripper Specification for GDDP-A.
  • Preparing Technical Bid Evaluation for GDDP-A Elastomeric Pads.
  • Preparing Technical Bid Evaluation for GDDP-A LMU’s.
  • Preparing Technical Bid Evaluation for GDDP-A Grout Seals.
  • Preparing Technical Bid Evaluation for GDDP-A Shock Cell.
  • Preparing Technical Bid Evaluation for GDDP-A Boatlanding & Floatover Fender. 

 

  • Provision For Tukau Timur Shallow Front End Engineering Design (FEED) And Tukau Timur Deep Conceptual Engineering For Baram Delta Gas Gathering-2 (BARDEGG-2) And Baronia Enhanced Oil Recovery (EOR) Development Project For Petronas Carigali Sdn Bhd (PCSB)
  • Responsible in preparing & completing the Substructure On-Bottom Analysis & Report for TTJT-A Platform.

 

  • Provision For Detailed Engineering (Phase 1) And Frond End Engineering Design (FEED) (Phase 2) For Baram Delta Gas Gathering-2 (BARDEGG-2) And Baronia Enhanced Oil Recovery (EOR) Development Project For Petronas Carigali Sdn Bhd (PCSB)
  • Responsible in preparing & completing the Substructure On-Bottom Analysis & Report for BNCPP-B Platform.
  • Responsible in preparing & completing the Substructure Miscellaneous Report for BNCPP-B Platform.
  • Responsible in preparing & completing the Substructure Launch Analysis & Report for BNCPP-B Platform.
  • Responsible in preparing & completing the Substructure Flotation Analysis & Report for BNCPP-B Platform.
  • Responsible in preparing & completing the Catholic Protection Analysis & Report for BNCPP-B Platform.

 

  • Provision Of Engineering Services For FEED And Follow-On Engineering Of Phase-3 Development (Wellhead Platforms, Subsea Pipeline And Brownfield Works) for Carigali-PTTEPI Operating Company Sdn Bhd (CPOC)
  • Responsible in preparing & completing the Jacket weight Control Report for TAPI-A and Melati (MTA) Platform.
  • Responsible in preparing & completing the Topside weight Control Report for TAPI-A and Melati (MTA) Platform.

 

  • Pipeline Detailed Engineering Design for Samarang Pipeline Replacement Project For Petronas Carigali Sdn Bhd (PCSB)
  • Responsible in preparing & completing the Structural Assessment Analysis Design Report for SMJT-G platform.
  • Responsible in Preparing & Completing The SMJT-E Miscellaneous Design Report and Analysis.

 

 

  • Provision Of Engineering, Procurement, Construction And Commissioning (EPCC) Of For Central Diyarbekir Development Project Topsides And Jacket For Petronas Carigali (Turkmenistan) Sdn Bhd (PCTSB) / ILK INŞAAT
  • Responsible in preparing & completing the Jacket Loadout analysis & report.
  • Responsible in preparing & completing the Drilling Deck Lifting analysis & report.
  • Responsible to perform Loadout analysis for Main Platform and prepare report.
  • Responsible in preparing & completing the Topsides Inplace Design report.

 

  • Provision of Front End Engineering Design (FEED) Services for Yetagun North Development Project for PC Myanmar (Hong Kong) Limited (PCML)
  • Responsible in preparing & completing the YET-D Substructure Boat Impact analysis & report.
  • Responsible to perform On-Bottom analysis for YET-D platform and prepare the report.

 

  • Provision Of Engineering Design For PMO Pipeline Replacement Project (PPRP) For Petronas Carigali Sdn Bhd (PCSB)
  • Responsible to perform lifting analysis for Bekok-A platform and prepare the report.
  • Responsible to perform lifting analysis for Tiong-A platform and prepare the report.

 

  • Provision Of Conceptual And Basic Engineering Services For Diamond Development Project, Blocks 01 & 02 Offshore Vietnam For PC Vietnam Limited (PCVL)
  • Responsible to prepare and complete the DMDP-A Boat Impact analysis and report.

 

  • Provision Of Detailed Design Services For Bekok-B Infill Project For Petronas Carigali Sdn Bhd (PCSB)
  • Responsible to prepare and complete the new conductor boat impact analysis and report.

 

  • Provision Of Engineering Support Services For Cendor Phase 2 Development Project, Block PM-304 for Petrofac (Malaysia-PM304) Limited (Early Production System Detail Design)
  • Assigned to go for a site visit at Cendor MOPU in Terengganu.
  • Responsible to check the location and the installation path for the new gangway.
  • Responsible to check the new deck extension for drop object protection over the ESD valve.

 

  • Provision Of Detailed Design Services (Phase II) for Kinabalu Non Associated Gas (NAG) Project for PETRONAS Carigali Sdn Bhd (PCSB)
  • Responsible in preparing the KNPG-B Installation Bumper & Welding Check Analysis for Module 1,2,3,4,5, MSF North, MSF Drilling and MSF South.

 

  • Detailed Design Engineering Of Mobile Offshore Production Unit (MOPU) Facility West Desaru Development Project, Block PM304 for Petrofac E&C Sdn Bhd
  • Acting as a Structural Refurbishment Engineer.
  • Responsible to prepare & completed Scope of Work for Structural Refurbishment.
  • Has been assigned to site to identify the structural and architectural item/member for the refurbishment work.
  • Responsible in preparing the structural MTO.

 

  • Provision Of Basic Design, Front End Engineering Design (FEED) and Detailed Design Services For South Pars Gas Development Project Phases 22, 23 & 24 For Petroleum Investigation Research & Engineering Co. (PIRE Co.) / PARS Oil And Gas Company (POGC)
  • Perform On-Bottom and Mudmat Design Analysis for the offshore pipeline crossing.
  • Perform a jacket Pre-service analysis & report on the on-bottom analysis and mudmat design for four (4) platforms which is SPD22, SPD23, SPD24A and SPD24B.
  • Perform boat impact analysis & report for two (2) different platform including SPD22 and SPD23.
  • Perform a load out analysis for SPD24B.
  • Perform Pile Driveability analysis & report for Flare tower including FSP22, FSP23, FSP24A, and FSP24B.

 

  • Provision Of Detailed Design Services (Phase II) for Kinabalu Non Associated Gas (NAG) Project for PETRONAS Carigali Sdn Bhd (PCSB)
  • Performed Topside’s In-Place Analysis for Service Platform   (Module 6) including the Access Platform, Strainer Service Platform, FE-245B and FIA 2460A.
  • Prepare KNPG-B Topside Miscellaneous Design Report for Module 6 (SOGT Compressor Train A & B).
  • Prepare the barge bumper analysis for Module 6.

 

 

GEOLAB (M) SDN BHD (June 2010 – Nov 2010)

Position    :     Engineer

WORK DESCRIPTION:

Performed non-destructive test (NDT) for pile and concrete structure at site including the PDA test, SIT test and Windsor probe test.

  • Pilling Work Fork The Proposed Construction Of Service Apartment Including
  • Piling Work For The Proposed And Completion Of Temporary Logistic Road At Jalan Bukit Kuching For Medini Development Iskandar Malaysia, Johor Darul, Takzim
  • Piling Work For The Proposed And Completion Of Petrol Station On PTD57015 H.S (D) 227378 Taman Setera Utama, Johor Bahru, Johor Darul, Takzim.
  • Piling Work For The Proposed And Completion Of Senai-Desaru Expressway (TNB Substation Package 3A), Johor, Darul Takzim
  • Piling Work For The Proposed And Completion Legoland, For Medini Development Iskandar Malaysia, Johor Darul, Takzim.
  • Proposed And Completion Of 23 Storey Apartment At Nusajaya, Johor Darul, Takzim
  • Piling Work For Proposed Construction Of Coastal Highway From Johor Bahru To Nusaya, Mukim Pulai, Daerah Johor Bahru, Johor Darul, Takzim
  • Piling Work For The Proposed And Completion Smart School For Medini Development Iskandar Malaysia, Johor Darul, Takzim

 

 

 

EDUCATIONs

July 2007 – April 2010 Universiti Teknologi Malaysia (UTM) Bachelor in Engineering
(Hons.) Civil  (CGPA:3.33)
July  2004 – Apr 2007 Universiti Teknologi Malaysia (UTM) Diploma in Civil Engineering (Hons.)   (CGPA:2.85)

 

SKILLS

Familiar with a range of proprietary software including SACS, GRL Weap, Microsoft Office, AutoCAD, Microsoft Visual Basics, Microsoft Project , STAAD Pro and familiar with relevant international codes and standards including PTS, AISC and API.

 

REFEREES

Name          : Helmy Hariri                           

Position      : Lead/Senior Engineer                   

Contact No: 019-2290440

 

Name          : Tasyriff Izzat                           

Position      : Lead/Senior Engineer                   

Contact No: 012-23685205

 

 

Availability                             : Available in 1 week

Skills
  • sacs 7 years by 2018
  • GRL weap 7 years by 2017
  • PTS 7 years by 2018
Employers
  • CIVIL/STRUCTURAL ENGINEER at RNZ INTEGRATED
    Oct 2010 - Dec 2017
  • CIVIL/STRUCTURAL ENGINEER at ARMADA TPCE
    Jan 2018
Educations
  • CIVIL ENGINEERING
    CIVIL ENGINEERING at UNIVERSITI TEKNOLOGI MALAYSIA
    2007 - 2010
SRI KEMBANGAN, SELANGOR,
View Contact Information