Phillips 66 Reports FCCU Shutdown at TX Refinery
Phillips 66 reported its unit 29 fluid catalytic cracking unit (FCCU) was shut down to repair process piping at the Borger, Texas, refinery.
The work began on Sunday and it expected to end on Aug. 25. The No. 40 FCCU at the refinery will undergo maintenance from Aug. 10 to Aug. 27, 2014
Refinery capacity: 146,000 barrels per day Source: Texas Commission on Environmental Quality filing
Reporting by Anupam Chatterjee