A development by Fugro for its work class remotely operated vehicles (ROVs) has been utilised successfully in cable lay touchdown monitoring operations at the Rampion Offshore Wind Farm. A new track base unit, fitted to its FCV ROV, has been introduced to ensure highly accurate cable positioning during cable lay operations in strong currents. The unit ensures the continuation of operations in strong currents by enabling the ROV to run along the seabed instead of flying through the water. It is fitted to the existing ROV frame but can be detached easily if required.
World Energy News is the global authority on the international energy industry, delivered to your Email two times per week.
Subscribe to World Energy News Alerts.