Saturday, November 23, 2024

Propulsion Equipment News

Wärtsilä to Optimize PLSVs of Sapura Brasil

Subsea services specialist Sapura Brazil has signed a five-year optimized maintenance agreement with Wärtsilä.As per the agreement the the Finnish tech major will support Sapura’s fleet of six pipe-laying support vessels' (PLSV) operational performance and increase both its efficiency and reliability by accurately predicting maintenance requirements. This will also help lower operating costs.The Wärtsilä solution includes asset diagnostics of the vessels’ main engines and thrusters to define the actual condition of the equipment.

Wärtsilä to Power Shell's 15 LNG Barges

A series of 15 inland waterway barges being built for Belgium based Plouvier Transport N.V., and which will be chartered by Shell Trading Rotterdam (Shell), are to be powered by Wärtsilä dual-fuel main engines. The barges will operate primarily on liquefied natural gas (LNG). Wärtsilä will also supply other propulsion equipment and its LNGPac fuel gas handling system. The ships’ hulls are under construction at the VEKA Shipyard CENTROMOST in Poland and outfitting will be carried out at VEKA Shipyard Werkendam. The contract with Wärtsilä was concluded in December.

LNG Vessel with Wartsila Integrated Solutions Delivered to Evergas

The first in a series of 27,500 cbm 'Dragon' class vessels ordered by Evergas, a world renowned owner and operator of seaborne petrochemical and liquid gas transport vessels, is being delivered from the Sinopacific Offshore & Engineering (SOE) shipyard in China today. The vessel features a comprehensive Wärtsilä solutions package, including two Wärtsilä 50DF dual-fuel engines, Wärtsilä propulsion equipment including the gearbox, two Wärtsilä 20DF auxiliary generating sets, a Wärtsilä LNG fuel system and a Wärtsilä cargo handling system.

Wärtsilä Receives Repeat Order from Evergas

Three new 27,000 cbm LNG/Multigas Carriers for Evergas, the Denmark based transporter of petrochemical gases and natural gas liquids, are to be built featuring the integrated Wärtsilä solution, comprising the main propulsion equipment, the gas fuel supply system, and the cargo handling system. This order is an extension of the one placed in 2013 for a series of three similar vessels. The ships are being built by the Sinopacific Offshore & Engineering (SOE) shipyard in China…

Wärtsilä enters Paraguayan Inland Market

Signing ceremony between Wärtsilä and Shipyard SA. Sitting from right to left: Guillermo Ehreke, GM and owner of Naviera Yeruti and Shipyard SA; Piotr Kabacinski, GM Sales, Americas, Wärtsilä Ship Power. Standing from right to left: Eduardo Masciottra, Warag SRL, Wärtsilä agent, Buenos Aires; Jorge de la Guardia, GM and owner of Naviera Yeruti and Shipyard SA; Joe Amyot, Area Sales Director, Wärtsilä Ship Power.

A new pushboat used to push barges convoys along the Paraguay River will be powered by a Wärtsilä integrated propulsion solution. The vessel is being built at the "Astillero la Barca del Pescador" (Shipyard SA) yard in Paraguay on behalf of Naviera Yeruti, a Paraguayan company with extensive barge construction and vessel operating interests. This vessel will be the company's first pushboat and it is scheduled to be delivered in the second quarter of 2015.

Rolls-Royce to Open Brazilian Offshore Facility

Rolls-Royce and U.K. Chancellor George Osborne announced today that the Group will further invest in Rio de Janeiro State to better support customers in the rapidly expanding offshore oil and gas industry. A new £22 million marine facility in Duque de Caxias will be used to assemble and test large thrusters and other propulsion equipment for use on semisubmersible rigs, drill ships, FPSOs and other highly complex offshore vessels. Construction at the 27,000 sqm site will begin next month.