Bibby Subsea Completes Decommissioning Work for Shell
For the 16-day campaign the Bibby Sapphire was equipped with an SMD Quasar work class remotely operated vehicle (ROV) to disconnect a previously decommissioned eight-inch oil export pipeline from a hot tap tee installed on the Amberjack Pipeline. The team was also tasked with removing the connecting subsea tie-in assembly, 353 feet below sea level.